Language

Etropole - Bulgaria

 

Capacity: 11.633 PE (60) with 3.320 m3/d

Start-up: 2014

Process: Activated sludge plant with extended aeration and floating/ moving fine bubble aeration according to BIOWORKS® design.

 

 

The municipal wastewater treatment plant is located 90 km east of Sofia in the province of the same name. The wastewater is discharged to the wastewater treatment plant by a mixed sewer canal.

The mechanical pre-treated water is distributed into two parallel-operated biological lines, which are constructed according the BIOWOKRS®-process – integrated basins for activated sludge basin an clarifier.


 

Go back

© All rights reserved

Add your Content here

Donec quam felis, ultricies nec, pellentesque eu, pretium quis, sem. Nulla consequat massa quis enim. Donec pede justo, fringilla vel, aliquet nec, vulputate eget, arcu.